Switching guide

How to move from MRPeasy to MirrorWorks

A step-by-step plan for a small fab shop: what to export, how it maps across, and how to cut over without stopping work. No project team, no consultants by the day.

What you need before you start

1

One person who knows the data

Usually the owner or whoever runs the office. You do not need IT staff or an implementation partner.

2

Admin access to MRPeasy

Enough to export lists to CSV or Excel. Read access to products, BOMs, contacts, orders and stock.

3

A few quiet hours

Spread over a week or two, alongside normal work. The floor keeps running the whole time.

Step 1: export from MRPeasy

Most lists in MRPeasy can be exported to a spreadsheet file. If you cannot find an export for a list, MRPeasy support can point you to it.

WhatWhere it lives in MRPeasyTip
Items and partsStock > Items. Export part numbers, descriptions, unit of measure, cost and selling price.Remove items you no longer stock or sell before you export.
Bills of materialsThe BOM for each product, with components and quantities. Routings can come across too.Note any routings that refer to machines you have since replaced. Bridge flags mismatched routes.
Customers and suppliersCRM and Procurement lists. Export company names, contacts, emails, addresses and terms.Skip contacts you have not dealt with in two years.
Open jobsManufacturing orders and open customer orders that are not finished.Add a column for where each job is up to on the floor.
Stock on handStock > Inventory. Export quantity on hand per item.Count your top 20 items before cutover so starting stock is right.

Get this as a PDF

Enter your work email and the download appears straight away. No account needed.

Menu names can differ between MRPeasy versions and setups. If something is not where we say, look for the same list under a nearby menu.

Step 2: map it across

You map columns once in the Bridge wizard. This is how the main MRPeasy fields line up.

In MRPeasyIn MirrorWorks
Part numberPart number
Part descriptionPart name and description
Unit of measureUnit (kg, m, sheet, each)
BOM componentsBill of materials components
Routing operationsRoutes and operations
Manufacturing order statusOpen job and its current status
In stockStarting stock

Anything that does not have an obvious home, such as a custom field, can stay in the description or notes for now. You do not have to get every column perfect on day one.

MirrorWorks Bridge

Step 3: import with Bridge

Bridge is the MirrorWorks import tool. It imports your customers, part numbers, jobs and stock from MRPeasy, spreadsheets, Xero or MYOB, and you can run both systems in parallel until your numbers match.

1

Guided wizard

Upload CSVs, map columns, preview, and commit. Built for shop owners, not IT teams.

2

Multi-file upload

Customers, products, BOMs and suppliers in parallel. Validation flags conflicts before anything is saved.

3

Bulk edit in the import

Select bad rows, correct them in place, re-validate and commit. No round trips to Excel.

4

Route fixing

Old routings rarely match new machine definitions. Bridge flags mismatches and suggests the correct route.

5

Open job import

Bring in jobs already on the floor with their current status, so day one is not a clean slate.

6

Rollback and re-run

Undo an import, fix the source file and run it again. Mistakes are not final.

Step 4: cut over without stopping work

A plan sized for a 1 to 20 person shop. Adjust the timing to suit your workload.

1

Week 1: tidy and export

Archive what you no longer use in MRPeasy. Export the five lists above. Nothing changes on the floor.

2

Week 1: import with Bridge

Drop the files into Bridge, map the columns, fix flagged rows and commit. Customers, parts, BOMs and suppliers first.

3

Week 2: run both side by side

Quote and run a handful of new jobs in MirrorWorks while MRPeasy keeps running. Check the numbers match before you rely on them.

4

Cutover at a natural break

Pick a Friday or the end of a week. Import open jobs with their current status, set starting stock from your count, and switch the floor over.

5

After cutover

Keep MRPeasy read-only until your next renewal so you can look things up. Then cancel it.

!

Accounting

On Make and the higher plans, launching early 2027, MirrorWorks works with Xero and MYOB. On Start, the Xero connection is coming and MYOB is not included. Until then, keep invoicing as you do today.

Not sure switching is worth it?

See how MirrorWorks compares with MRPeasy on cost and fit for fabrication.

MirrorWorks vs MRPeasy

Work out your switching cost

The ERP Switch Report estimates what staying and switching cost over the next few years.

Get your Switch Report

Founding shops get help moving

Start opens December 2026. Founding shops get 40% off any paid plan for 12 months, activated within 6 months of Start access, plus setup and migration support within reason and access to Bridge.