Job costing calculator

Did that job actually make money?

Put in what you quoted and what one job actually took. See where the margin went, line by line. One job at a time, no account needed.

Do not know your labour rate? Use the fab shop hourly rate calculator.

LineUnitCost per unitQuotedActualDifference
Materialkg+A$144.00
CuttinghoursA$95.00+A$47.50
FoldinghoursA$95.00+A$47.50
Welding and fabricationhoursA$95.00+A$380.00
Finishing and assemblyhoursA$95.00+A$95.00
Consumables (gas, wire, discs)A$n/a+A$60.00
Subcontract (galv, powder coat)A$n/a+A$70.00

Quoted cost

A$3,884

Margin planned: 40.2%

Actual cost

A$4,728

Margin made: 27.3%

Margin lost on this job

A$844

The biggest overrun was welding and fabrication.

Get this as a PDF

Enter your work email and the download appears straight away. No account needed.

Where the spreadsheet version breaks

Checking one job like this is useful. Doing it for every job in a spreadsheet is where most shops give up.

Hours get typed twice

Once on a timesheet, then again into the job sheet, usually days later from memory.

Actuals arrive too late

By the time the numbers are in, the job is invoiced and the next quote has already gone out at the same price.

One file per job

Copies drift apart. Rates change in one file and not the others, and nobody can see all jobs side by side.

Material prices go stale

Steel prices move. A cost per kg typed in months ago quietly eats the margin on every job that uses it.

MirrorWorks Start tracks quoted and actual time on every job as the work happens, so you see the overrun while you can still do something about it. Free for one person, opening December 2026. See Start