Shop rate calculator

What should your shop charge per hour?

Labour, overheads and machine time, in AUD, NZD or GBP with GST or VAT. Enter your numbers and the calculator does the rest. No account needed.

Labour

Overheads per year

Machine rates

Yearly cost = lease or depreciation plus maintenance. Hours = hours the machine actually runs per year.

Your shop labour rate, excluding GST

A$117.47 per hour

A$129.22 per hour including GST at 10%

Break-even: A$97.89 per billable hour

Billable hours a year: 4,894

Labour cost a year: A$332,120

Overheads a year: A$147,000

Machine rates (add to labour)

Press brake: A$45.00 per run hour

Laser or plasma: A$70.00 per run hour

Welders: A$4.80 per run hour

Get this as a PDF

Enter your work email and the download appears straight away. No account needed.

How this is worked out

Only billable hours count

Nobody pays for time spent cleaning up, waiting on steel or fixing rework. Dividing costs by billable hours, not paid hours, is why the rate is higher than most shops expect.

Overheads are spread across every hour

Rent, power, insurance and office wages are paid whether the floor is busy or not, so each billable hour has to carry its share.

Machines are priced separately

A laser or press brake hour costs more than a hand-finishing hour. Adding machine time on top keeps light jobs from subsidising heavy ones.

Want to quote with this rate and see it against real job costs? MirrorWorks Start is free for one person and opens December 2026.

Estimates only. Check your figures with your accountant.